Chapter 13: Downtime SOP: Paper Register and Back Entry
1. Purpose#
To maintain operational bed management during server, network, or power outages using physical paper registers, followed by mandatory back-entry within two hours.2. Scope#
All hospital admitting desks, casualty wards, and specialty inpatient units.3. Responsibility#
All On-duty Clinical Staff, Bed Managers, and IT Facility Incharge.4. Prerequisites#
Pre-printed physical Shayya Setu Contingency Registers available at every nursing station.5. Procedure#
1. If an outage exceeds 15 minutes, initiate physical logging in the designated paper register. 1. Record exact event time, bed identifier, patient UHID, originating status, and target status in ink.
Click to Zoom
ID: hospital/h19_index_register
📅 Screenshot Date: 27 Sep 2026
- Upon network or power restoration, the Bed Manager initiates electronic back-entry.
- Enter each logged event using the Late Entry interface, specifying the actual historical event timestamp.
- All back-entries must be completed within 2 hours of system restoration.